Judging Criteria

The jury panel will consider the following judging criteria for the respective award categories:

(I) Planning

Site visit is not required.

Surveyors’ Contribution

Judging Criteria

  1. Project Inception and Project Planning (20%)
  1. Sound project vision
  2. Comprehensive feasibility studies, valuation and analysis
  3. Sufficient consideration on social, cultural and/or environmental elements
  4. Innovative methodology in site creation or site acquisition
  1. Land Administration (20%)
  1. Effective application of land administration knowledge
  2. Effective skills on land acquisition or site assembly
  3. Consideration on value management principles
  4. Balanced input on social, economical, cultural and/or environmental considerations
  1. Town Planning Approvals, Statutory Approvals and Engagement with Local Public Bodies (20%)
  1. Sound demonstration of different strategies in applications, reviews and/or appeals
  2. Problem solving tactics and skills
  3. Effectiveness and timeliness in seeking statutory approvals
  4. Effective engagement with local public bodies
  1. Sustainability Values, Processes, and Impact (20%)
  1. Integration of innovative sustainable practices in surveying process
  2. Implementation of a sustainability strategy aimed at reducing environmental impact while simultaneously enhancing capacity for effective climate change-related planning and management
  3. Measures taken to promote social sustainability, such as improving education, raising awareness, and building capacity for climate change mitigation and adaptation, particularly in vulnerable communities
  4. Implementation of energy-saving strategies and technologies, including but not limited to the utilization of renewable energy sources, to improve energy efficiency
  5. Effective establishment of governance policy and procedure on the operation, aiming for integrity, equality, diversity & inclusion, balancing the interests of stakeholders
  1. Innovation and Technology (20%)
  1. Use of innovative technology for site selection, planning and project feasibility analysis
  2. Innovative technology for stakeholder engagement, communication, and project scoping
  3. Incorporation of innovative technology for conceptual design, modelling, and simulation
  4. Adoption of innovative technology for cost estimation, scheduling, and risk assessment

 

(II) Pre-construction

Site visit is not required.

Surveyors’ Contribution

Judging Criteria

  1. Resources and Financial Arrangement (20%)
  1. Formulation of a comprehensive project team
  2. Comprehensive assessment of investment risk
  3. Cost estimation methodologies (modified approach due to the project nature)
  4. Effective project financial arrangement
  1. Design Development (20%)
  1. Modification of design for a balance between maximisation of development potential and social values
  2. Effectiveness of design in terms of adaptability, safety and efficiency in functionality and carbon neutrality
  3. Adoption of sustainable conservation strategies in design
  4. Consideration of design for maintenance
  5. Adoption of passive design for energy conservation
  1. Procurement (20%)

 

  1. Procurement and packaging strategy
  2. Comprehensive consideration on choice of materials, mode of construction, project services and facilities
  3. Preparation and review of tender documents to mitigate variation orders during construction and contractual terms preparation to attract more competitive bid
  4. Tender assessment method approach strategy
  5. Approach in tender evaluation planning including but not limited to application of advanced technology  
  1. Sustainability Values, Processes, and Impact (20%)
  1. Integration of innovative sustainable practices in surveying process
  2. Implementation of a sustainability strategy aimed at reducing environmental impact while simultaneously enhancing capacity for effective climate change-related planning and management
  3. Measures taken to promote social sustainability, such as improving education, raising awareness, and building capacity for climate change mitigation and adaptation, particularly in vulnerable communities
  4. Implementation of energy-saving strategies and technologies, including but not limited to the utilization of renewable energy sources, to improve energy efficiency
  5. Effective establishment of governance policy and procedure on the operation, aiming for integrity, equality, diversity & inclusion, balancing the interests of stakeholders
  1. Innovation and Technology (20%)
  1. Use of innovative technology for project management, scheduling, and progress tracking
  2. Innovative technology for quality control and risk management
  3. Incorporation of innovative technology for site safety, inspections, and simulations
  4. Adoption of innovative technology for supply chain optimisation and remote site monitoring

 

(III) Construction

Site visit will be conducted.

Surveyors’ Contribution

Judging Criteria

  1. Value and Cost Management (20%)
  1. Application of value management concept with effective cost reduction or other financial benefits
  2. Other means of cost-effective measures in surveying practices
  3. Supply chain optimisation
  4. Waste management strategies
  1. Project Management (20%)
  1. Procurement and packaging strategy
  2. Comprehensive consideration on choice of materials, mode of construction, project services and facilities
  3. Preparation and review of tender documents to mitigate variation orders during construction and contractual terms preparation to attract more competitive bid
  4. Tender assessment method approach strategy
  5. Approach in tender evaluation planning including but not limited to application of advanced technology
  1. Construction Management  (20%)
  1. Comprehensive planning in the Construction Program
  2. Producing accurate geospatial measurements of the construction site, including locations, elevations, and critical data points
  3. Monitoring construction to ensure adherence to standards and prompt issue resolution
  4. Identifying and minimizing safety hazards on the construction site
  5. Implementing fair and effective methods for assessing works in progress to ensure accurate and fair evaluation
  1. Sustainability Values, Processes, and Impact (20%)
  1. Integration of innovative sustainable practices in surveying process
  2. Implementation of a sustainability strategy aimed at reducing environmental impact while simultaneously enhancing capacity for effective climate change-related planning and management
  3. Measures taken to promote social sustainability, such as improving education, raising awareness, and building capacity for climate change mitigation and adaptation, particularly in vulnerable communities
  4. Implementation of energy-saving strategies and technologies, including but not limited to the utilization of renewable energy sources, to improve energy efficiency
  5. Effective establishment of governance policy and procedure on the operation, aiming for integrity, equality, diversity & inclusion, balancing the interests of stakeholders
  1. Innovation and Technology (20%)

 

  1. Use of innovative technology for project management, scheduling, and progress tracking
  2. Innovative technology for quality control, safety, and risk management
  3. Incorporation of innovative technology for site safety, inspections, and simulations
  4. Adoption of innovative technology for supply chain optimisation, remote site monitoring, and inventory management

 

(IV) Sales and Leasing

Site visit is not required.

Surveyors’ Contribution

Judging Criteria

  1. Marketing Concept Development (15%)

 

  1. Promote the merits of “Development and Conservation” to society
  2. Strategic approach to meet Lease against Sale objectives
  3. Consideration of social benefits against economic benefits
  1. Sales and/or Leasing Strategies (30%)

 

  1. Formulation of effective sales and/or leasing program
  2. Engagement of target tenants/users
  3. Effective negotiation tactics and skills to accomplish leasing objectives
  4. Effective tactics in obtaining Pre-sale Consent
  5. Innovative strategies in structuring price lists to accomplish sales target within target date
  1. Marketing Management (15%)

 

  1. Rationale to determine allocation of resources in marketing
  2. Measures to evaluate effectiveness of marketing costs against sales and/or leasing results
  3. Measures to evaluate public awareness of the marketing campaign
  4. Marketing management mechanism
  1. Sustainability Values, Processes, and Impact (20%)
  1. Integration of innovative sustainable practices in surveying process
  2. Implementation of a sustainability strategy aimed at reducing environmental impact while simultaneously enhancing capacity for effective climate change-related planning and management
  3. Measures taken to promote social sustainability, such as improving education, raising awareness, and building capacity for climate change mitigation and adaptation, particularly in vulnerable communities
  4. Implementation of energy-saving strategies and technologies, including but not limited to the utilization of renewable energy sources, to improve energy efficiency
  5. Effective establishment of governance policy and procedure on the operation, aiming for integrity, equality, diversity & inclusion, balancing the interests of stakeholders
  1. Innovation and Technology (20%)

 

  1. Innovative technology that increases operational efficiency
  2. Innovative technology that enhances tour experience, generates leads, and provides market insights
  3. Adaptability to emerging innovative technology and market changes

 

(V) Post-Occupation

Site visit will be conducted.

Surveyors’ Contribution

Judging Criteria

  1. Value Enhancement (25%)

 

  1. Adoption of cost-effective measures in surveying practice and procurement
  2. Life cycle costing measures
  3. Enhancement to property in terms of value, standards, design etc
  4. Adaptive reuse of existing property to generate new source of revenue
  1. Property/Facility Management (25%)
  1. Resources and waste management
  2. Environmental policies beyond statutory requirements
  3. Effective operation, maintenance, resilience planning and adaptability to deal with changing market
  4. Clients’ satisfaction in terms of quality, efficiency and value for money
  1. Sustainability Values, Processes, and Impact (25%)
  1. Integration of innovative sustainable practices in surveying process
  2. Implementation of a sustainability strategy aimed at reducing environmental impact while simultaneously enhancing capacity for effective climate change-related planning and management
  3. Measures taken to promote social sustainability, such as improving education, raising awareness, and building capacity for climate change mitigation and adaptation, particularly in vulnerable communities
  4. Implementation of energy-saving strategies and technologies, including but not limited to the utilization of renewable energy sources, to improve energy efficiency
  5. Effective establishment of governance policy and procedure on the operation, aiming for integrity, equality, diversity & inclusion, balancing the interests of stakeholders
  1. Innovation and Technology (25%)
  1. Innovative techniques in customer communication and management
  2. Enhancement on health and safety
  3. Innovative ideas and technology on operational procedures
  4. Service quality, business resilience and emergency handling

 